Objective

Achieve a balanced test distribution that is fast and still catches integration defects.

Environment

  • Existing test suites
  • Suite duration metrics
  • Coverage data

Steps

1. Measure the current distribution

Count tests and total duration by level: unit, integration, and end-to-end.

Expected state: The current imbalance is quantified.

2. Move logic to unit tests

Push assertions down to unit level where the logic can be tested in isolation.

Expected state: Slow end-to-end coverage is partly replaced by fast units.

3. Keep critical end-to-end journeys

Retain a small set of end-to-end tests for real user journeys only.

Expected state: End-to-end tests cover journeys, not every branch.

4. Re-measure and iterate

Confirm the suite is faster while defects are still caught.

Expected state: Faster suite with equivalent defect detection.

Decision points

More end-to-end coverage?

  • Add integration and unit instead
  • Add more end-to-end

Push coverage down the pyramid; end-to-end tests are slow and brittle.

Delete redundant tests?

  • Remove higher-level duplicates
  • Keep everything

Remove end-to-end tests whose assertions are covered lower down.

Expected outcome

A balanced suite that runs quickly while still detecting integration and journey defects.

Verification

Confirm suite duration falls, unit tests cover logic, and end-to-end tests remain for critical journeys.

Cleanup

Document the target distribution and review it each quarter.

Overview

Achieve a balanced test distribution that is fast and still catches integration defects.

This workflow is reusable across teams and environments; adapt the commands to your tooling while keeping the sequence and checkpoints intact.

Environment and prerequisites

  • Existing test suites
  • Suite duration metrics
  • Coverage data

Procedure

1. Measure the current distribution

Count tests and total duration by level: unit, integration, and end-to-end.

Expected state: The current imbalance is quantified.

2. Move logic to unit tests

Push assertions down to unit level where the logic can be tested in isolation.

Expected state: Slow end-to-end coverage is partly replaced by fast units.

3. Keep critical end-to-end journeys

Retain a small set of end-to-end tests for real user journeys only.

Expected state: End-to-end tests cover journeys, not every branch.

4. Re-measure and iterate

Confirm the suite is faster while defects are still caught.

Expected state: Faster suite with equivalent defect detection.

# count tests and duration by suite
npx vitest run --reporter=json | jq '[.testResults[].assertionResults[] | .duration] | add'

Verification

Confirm suite duration falls, unit tests cover logic, and end-to-end tests remain for critical journeys.

Decision points

More end-to-end coverage?

  • Add integration and unit instead
  • Add more end-to-end

Recommendation: Push coverage down the pyramid; end-to-end tests are slow and brittle.

Delete redundant tests?

  • Remove higher-level duplicates
  • Keep everything

Recommendation: Remove end-to-end tests whose assertions are covered lower down.

Common failures

  • Top-heavy suites are slow and flaky.
  • Removing coverage without replacing it increases risk.
  • Keeping redundant tests wastes CI time.