Service Mesh Upgrade Workflow
Upgrade the control plane and data plane in stages, verify compatibility, watch for sidecar or ambient transition issues, and keep rollback simple.
Objective
Upgrade a service mesh across control and data planes with minimal disruption and a clear rollback.
Environment
- A service mesh installation
- Compatibility notes for the target version
Steps
1. Review compatibility between control plane, data
Review compatibility between control plane, data plane, and Kubernetes versions.
Expected state: Known incompatibilities are handled first.
2. Upgrade the control plane and verify
Upgrade the control plane and verify configuration still reconciles.
Expected state: Control plane is healthy before the data plane moves.
3. Roll the data plane gradually, verifying
Roll the data plane gradually, verifying traffic between batches.
Expected state: Sidecars upgrade without breaking traffic.
4. Keep the previous version available until
Keep the previous version available until confidence is high.
Expected state: Rollback is one step.
Decision points
Big-bang or staged data plane?
- Staged
- Big-bang
Staged by namespace or batch; the data plane touches every request path.
Sidecar or ambient for new workloads?
- Pilot ambient
- Sidecar only
Pilot ambient on low-risk workloads; validate observability and policy parity before broad adoption.
Expected outcome
Control and data planes upgraded with traffic healthy through the rollout and a tested rollback path.
Verification
Confirm error rates and latency stay normal through each data-plane batch and that the pod and sidecar versions converge.
Cleanup
Record the version transition and remove the explicit image pins after full rollout.
Overview
Upgrade a service mesh across control and data planes with minimal disruption and a clear rollback. Confirm error rates and latency stay normal through each data-plane batch and that the pod and sidecar versions converge.
Steps
- Review compatibility between control plane, data plane, and Kubernetes versions. Expected state: Known incompatibilities are handled first.
- Upgrade the control plane and verify configuration still reconciles. Expected state: Control plane is healthy before the data plane moves.
- Roll the data plane gradually, verifying traffic between batches. Expected state: Sidecars upgrade without breaking traffic.
- Keep the previous version available until confidence is high. Expected state: Rollback is one step.
istioctl x precheck
istioctl upgrade --set profile=default
kubectl rollout restart deploy -n prod
Verification
- Control and data planes upgraded with traffic healthy through the rollout and a tested rollback path.
Decision points
- Big-bang or staged data plane? Options: Staged; Big-bang. Recommended: Staged by namespace or batch; the data plane touches every request path.
- Sidecar or ambient for new workloads? Options: Pilot ambient; Sidecar only. Recommended: Pilot ambient on low-risk workloads; validate observability and policy parity before broad adoption.