Task

Convert a full-table copy into an incremental load keyed on a watermark, with idempotent reruns and a provable completeness check.

When to use this

A nightly job copies 40 million rows wholesale, takes four hours, and misses anything created after the copy starts. The warehouse is always a day stale and sometimes wrong.

Prerequisites

  • A source column that is monotonic (updated_at with a trigger, or a sequence id)
  • A destination table with the same key
  • A place to store the watermark (one-row table or config)

Steps

1. Verify the candidate watermark is actually monotonic.

psql -d source -c "SELECT count(*) FROM (SELECT updated_at, lag(updated_at) OVER (ORDER BY id) prev FROM events) t WHERE prev IS NOT NULL AND updated_at < prev;"

Expected output: A count of zero proves updated_at never moves backward, so it is safe as a watermark; any nonzero count means late updates will be missed.

2. Create the watermark store keyed by pipeline name.

psql -d warehouse -c "CREATE TABLE IF NOT EXISTS etl_watermarks (pipeline text PRIMARY KEY, watermark timestamptz NOT NULL, rows_copied bigint DEFAULT 0, updated_at timestamptz DEFAULT now());"

Expected output: The one-row-per-pipeline table exists, holding the last safely-copied position for this load.

3. Copy only rows past the watermark, in bounded batches.

-- increment.sql
WITH wm AS (
  SELECT watermark FROM etl_watermarks WHERE pipeline = 'events' FOR UPDATE
), batch AS (
  SELECT * FROM source.events
  WHERE updated_at > (SELECT watermark FROM wm)
  ORDER BY updated_at
  LIMIT 50000
)
INSERT INTO warehouse.events
SELECT * FROM batch
ON CONFLICT (id) DO UPDATE SET
  payload = EXCLUDED.payload, updated_at = EXCLUDED.updated_at;

Expected output: Each run copies at most 50k new-or-changed rows; the FOR UPDATE lock serializes concurrent runs of the same pipeline.

4. Advance the watermark only as far as the batch actually copied.

UPDATE etl_watermarks w
SET watermark = b.max_ts,
    rows_copied = w.rows_copied + b.n,
    updated_at = now()
FROM (
  SELECT max(updated_at) max_ts, count(*) n
  FROM warehouse.events
  WHERE updated_at > (SELECT watermark FROM etl_watermarks WHERE pipeline = 'events')
) b
WHERE w.pipeline = 'events'
  AND b.max_ts IS NOT NULL;

Expected output: The watermark moves to the maximum timestamp actually present in the destination, never to the wall clock, so a crashed batch leaves nothing behind.

5. Verify completeness with a source-versus-destination count.

psql -d source -t -c "SELECT count(*) FROM events WHERE updated_at <= (SELECT watermark FROM dblink('dbname=warehouse', 'SELECT watermark FROM etl_watermarks WHERE pipeline = ''events''') AS t(watermark timestamptz))" 2>/dev/null || echo "run: SELECT count(*) FROM warehouse.events vs source up-to-watermark"

Expected output: Rows-up-to-watermark counts match between source and destination, proving the incremental load lost nothing.

Troubleshooting

Problem

Rows arrive with old timestamps after being copied

Solution

Late-arriving backdated rows sit below the watermark forever; add a daily full-diff on id hashes, or run a periodic backfill sweep for updated_at <= watermark with a content checksum comparison.

Problem

Hard deletes at the source are never propagated

Solution

Watermarks copy inserts and updates only; capture deletes via a soft-delete flag, a CDC log, or a nightly anti-join that removes ids missing from the source snapshot.

Problem

Two job instances run at once

Solution

The FOR UPDATE lock makes the second wait; if your engine lacks row locks, use an advisory lock or a lease column with a heartbeat, and keep the batch small so waits stay short.

Limitations

  • Watermark correctness depends on source monotonicity; without a database-enforced order, late updates require a reconciliation sweep.
  • Equal-timestamp batches split across runs need >= watermark semantics or unique id tie-breaking to avoid duplicates.

Copy the delta, advance the mark, prove the count

A watermark turns a four-hour wholesale copy into a seconds-long delta load. The three non-negotiables: a verified monotonic column, a watermark that advances only to what was actually copied, and an idempotent upsert so reruns after crashes are free.

-- nightly full copy (before):
--   4h, 40M rows, misses rows created mid-copy

-- incremental (after):
WITH wm AS (
  SELECT watermark FROM etl_watermarks
  WHERE pipeline = 'events' FOR UPDATE
)
INSERT INTO warehouse.events
SELECT * FROM source.events
WHERE updated_at > (SELECT watermark FROM wm)
ORDER BY updated_at LIMIT 50000
ON CONFLICT (id) DO UPDATE SET
  payload = EXCLUDED.payload;

-- then advance watermark to max(updated_at) IN DESTINATION
-- runtime: 8-40s, restart-safe, nothing lost

Advance to the data, never to the clock

The classic watermark bug is setting it to now() after copying: a row committed during the copy with a timestamp between batch-max and now() is skipped forever. Advancing only to the maximum timestamp actually observed in the destination means every skipped row is still above the mark and will be caught next run.

Idempotency is what makes it operational

ON CONFLICT upsert means the batch can run twice without duplicates, which is what lets you restart after a failure without cleanup. Combined with small batches and the row lock, the job becomes something you can rerun aggressively during an incident instead of tiptoeing around.