How to Communicate During an Incident
Run an incident with a clear commander, a single channel and regular status updates so responders and stakeholders stay aligned.
On this page
Introduction
An incident is as much a communication problem as a technical one. When nobody knows who is deciding, two people make conflicting changes; when stakeholders do not know the status, they interrupt responders to ask; when the timeline is not recorded, the review cannot find what happened. Incident communication is a small set of practices: one commander, one channel, regular updates, and a written timeline. These practices are not overhead on top of the fix; they are what keeps the fix coherent when several people are working at once and the situation is changing. This article covers the roles, the cadence of updates, how to keep stakeholders informed without interrupting the response, and how the practice feeds the post-incident review.
Why Communication Is Part of the Incident
A technical response needs coordination: someone has to decide priorities, and everyone has to know what is being tried so they do not duplicate or contradict it. Without coordination, responders work at cross purposes and the incident lasts longer. The communication is not overhead on top of the fix; it is the mechanism that makes the fix coherent.
Stakeholders outside the response also need to know: support is answering users, a manager is fielding questions, and someone may need to decide whether to communicate externally. Without a channel that keeps them informed, they interrupt the responders, which slows the response. A single channel with regular updates removes the interruptions.
Roles: Commander and Scribe
An incident commander coordinates: they decide who works on what, resolve conflicting approaches, and keep the response focused. The commander does not have to be the most senior engineer; the role is about coordination, not expertise, and assigning it explicitly avoids the situation where everyone assumes someone else is deciding.
A scribe records the timeline: what was observed, what was changed, what the effect was, and when. The timeline is what makes the review possible, because memory after a stressful event is unreliable. The scribe is a separate role from the commander so the commander can think about the response while the record is kept.
The Incident Channel
All incident communication goes in one channel, so there is a single place to read the status and a single place to contribute. A separate channel from the day-to-day keeps the incident readable and keeps ordinary chat from burying it. Tell responders to move their discussion there, and post the channel link wherever people will look for it.
The channel should hold only the incident: observations, decisions, updates and the timeline. Side conversations move to threads or direct messages, so the main channel stays a record. The commander declares when the incident starts and when it is resolved, so everyone knows the state.
Status Updates and Cadence
Updates should be regular, even when there is nothing new, because a silent channel makes stakeholders think nobody is working. State what is known, what is being tried, what the current impact is, and when the next update will come. Repeating a template keeps updates consistent and fast to write under pressure, and makes the timeline readable afterwards.
**Incident update — 2026-10-23 14:32 UTC**
- Status: active — mitigation in progress
- Impact: checkout failures for ~12% of sessions in EU; no data loss
- Current theory: connection pool exhaustion after the 14:10 deploy
- Actions in flight:
- roll back the deploy (owner: alice) — started 14:25
- raise pool size as a stopgap (owner: bob) — done 14:28
- Next update: 14:45 UTC (or sooner if we resolve)
- Channel: #inc-2026-10-23-checkout
Stakeholders and External Communication
Keep stakeholders in a separate, read-mostly channel or thread so they can follow without interrupting the response. The commander or a designated liaison owns the stakeholder update, freeing the responders to work. When an update has to go to users, a status page or a public post, the liaison drafts it from the incident channel, and the commander approves it before it goes out.
External communication is a legal and trust matter: say what is known, what is affected, and when the next update will come, and do not speculate about cause or blame. A vague but honest update is better than a confident guess that turns out wrong, because the correction costs more trust than the uncertainty.
# A communication plan keeps roles and channels explicit.
incident:
commander: alice # decides priority and actions
scribe: bob # records the timeline
liaison: carol # updates stakeholders, drafts external comms
channels:
response: '#inc-2026-10-23-checkout' # all response discussion
stakeholders: '#support-leads' # read-mostly updates
public: 'status.example.com' # approved external updates
cadence:
update_every_minutes: 15 # update even if nothing changed
escalate_if_no_progress_minutes: 30 # bring in more help
The Post-Incident Review
The written timeline is the input to a blameless review: what happened, why it happened, what made it better or worse, and what would prevent or detect it sooner. The review looks at systems and processes, not people, because blaming an individual stops people reporting what they did, which hides the information the review needs.
The review produces actions with owners and dates, and those actions are tracked to completion. A review whose actions are never done is theatre, and it will not change the outcome next time. Track the actions the way you track any other work, and revisit them.
Conclusion
Incident communication is one commander, one scribe, one channel, regular updates and a written timeline. The commander coordinates and the scribe records, so the responders stay focused; a single channel keeps the record in one place; regular updates stop stakeholders from interrupting; and a liaison handles external messages so responders keep working. The timeline feeds a blameless review whose actions are tracked to completion. Then the response is coherent and the next incident is shorter.
Sources: Google SRE Book: Managing Incidents, PagerDuty: incident response, Google SRE Book: Postmortem Culture.
FAQ
- Why assign an incident commander explicitly?
- Because without one, everyone assumes someone else is deciding and two responders make conflicting changes. The role is coordination, not expertise; naming it makes the response coherent and prevents duplicated work.
- Why send updates when there is nothing new?
- A silent channel makes stakeholders think nobody is working and prompts them to interrupt to ask. Regular updates, even when only to say there is no change, keep them informed and free the responders to work.